Day 1--Pink tile was removed from the walls
Day 2--Drywall was installed and taped.
Day 3--Rotted corner at the tub was repaired and new subfloor installed. Drywall was spackled.
Day 4--Tub surround and hardware were installed.
Day 5--Drywall was finished and prepped for painting.
Day 6--New vinyl flooring was installed and painting began.
The last bit of pink that still lingered inside the closet disappeared.
Painting is the only thing we're doing ourselves. When you are remodeling a necessary room you don't want to drag it out long. The contractor will be back Monday to replace the vanity, toilet, and mirror and finish up. Check back later for the before and after photos.